NOTICE TO CONSULTANTS ( Bridges)
No. KR/PD/6
Date 17/09/2002
Sub: - Construction of Katra
Qazigund section of Jammu Srinagar- Baramulla New B.G. Railway Line. Consultancy
for the Construction of Major Bridges
The Construction of above line from
Km 30 to Km 120 between Katra Quazigund shall be undertaken by Konkan Railway
Corporation Ltd. , which includes construction of number of major bridges and series of
tunnels. The entire line has to be completed in a tight target period. Considering the
terrain, the bridges have to be designed and constructed using innovative methods.
Salient
features of the proposed bridges will be:
1.
All these
bridges will be of Pre-stressed concrete/RCC/steel Girders.
2.
There will be
repetition of standard spans 3 or 4 standard spans will be chosen.
3.
The
foundations can be that of piles quick boring piles or micropiles coupled with
concepts of well piles. Foundations can also be stabilised for the variable geological
conditions.
4.
Since it is a
Earthquake prone zone, all structures have to be designed for earthquake resistance.
5.
Method of
construction will also be standardized.
6.
Slipform
construction for all piers will be a MUST.
7.
We can also go
for lighter pre cast beams integrated in-situ to form the decks and post tensioned.
8.
Bridges would
be elegant and the structures will merge with nature.
9.
The bridges
shall be designed considering the forces likely to arise during construction depending
upon construction method proposed.
10.
The bridges
shall be designed such that even if one component fails the other component shall maintain
the structural integrity,stability and safety.
The following criteria for
screening are laid down: -
1. Details
of Major Railway or highway or any Bridge works designed / checked (Bridges with a single span of 20m) during last 5 years.
2. Details
of professional organization:- man-power with bio-data of key professional staff.
3. Capability
to design the structures.
4. Experiences
if any, for designing the bridges in Himalayan region.
The above details should be,
submitted in the prescribed format on Excel sheet on a CD and one set of hard copy duly
signed by the authorised signatory.
For
pre-qualifying the consultants following weight ages will be given against each
item/strength of the consultants:
Sr. No. |
Items |
Unit for Assessment |
% Weight age |
1 |
Work done experience during last
5 years- design of minimum 2-major Railway. / Road bridges including construction
planning. |
No. of works |
30 |
2 |
Capability to design the
structure a) Minimum design organisation consisting of competent 5 Postgraduate Engineers
and 5 Graduate Engineers. |
No. of Design engineers. |
30 |
3 |
Availability of design / drawing
equipment including software Minimum equipment to be owned by consultant is as per
Annexure |
No. of equipment |
10 |
4 |
Financial status. Turn over
during last 5 years should be Rs 5 Crores minimum
(Cumulative) |
In Crores |
20 |
5 |
Experience of any works in
Himalayas |
No. of works |
10 |
TOTAL |
|
||
NOTES:
1. The
Consultants who will be fulfilling the criteria of 1 above with cumulative weightage of
60% only will be considered for pre-qualification.
2. Processing
charges of Rs.10, 000/- will have to be deposited along with the pre-qualification
documents in the form of a Demand Draft drawn in the favor of Dy. FA & CAO, KRCL,
payable at Navi Mumbai.
3. The
applications for pre-qualification shall be submitted at the following address.
4. The General Manager (Projects)
Konkan Railway Corporation
Ltd.
Raigad Bhavan, 8th
Floor
Plot No. 4, Sector 11
CBD, Belapur
Navi Mumbai 400 614
5. Joint
Ventures (JV) or Consortiums are permitted. JV or Consortium documents shall accompany the notarized copy
of the JV or Consortium.
6. The
value of the work executed, as a JV/Consortium partner will be considered for assessment
provided the Clients issue the
certificates.
Year before |
Multiplying factor |
Actual Contract* value |
Update value of Contract in
Crore Rs |
One (2001-2000) |
1.10 |
|
|
Two (2000-1999) |
1.21 |
|
|
Three (1999-1998) |
1.33 |
|
|
Four (1998-1997) |
1.46 |
|
|
Five (1997-1996) |
1.61 |
|
|
8. The
Agency is informed that only factually correct information is to be furnished. In the
event of detection of incorrect information, the Agency is liable to be summarily
disqualified or terminated or blacklisted.