PRE
QUALIFICATION OF TECHNOLOGY PARTNERS TO CONSTRUCT TUNNELS ON KATRA LAOLE SECTION OF
JAMMU SRINAGAR - BARAMULLA NEW B.G. RAILWAY LINE
The Construction of above line from Km. 30 to Km. 120 between Katra Quazigund shall be undertaken by Konkan Railway Corporation Ltd. , which includes construction of tunnels, major bridges and other civil engineering work such as Earth work in cuttings / embankments and minor bridges. The entire Railway line has to be completed in the tight target period. For the purpose of convenience and easy handling the construction of tunnels is grouped into number of packages. Each package will consist of a tunnel of more than one km. or group of tunnels with approx. length of 1 km.
Salient features of the tunnels will be:
1. There will be series of tunnels. Length of tunnels will be varying between 100 m. to 7,000 m.
2.
The work includes excavation in tunnel proper and in approach open cuts in all
types of soil / rock.
3.
The alignment of tunnels is always from the roads and as such access to the
faces of tunnels may be difficult and contractors have to make their own arrangement, for
approach as well as water and power required including other needs at their own cost.
4.
The tunneling is to be excavated in all types of soils/ rock with permanent
steel supports, concrete lining, shotcreting, rock bolting, cement pressure
grouting etc.
5.
The method of tunnel excavation will be highly mechanized and/or with
conventional type.
6.
The work also includes flooring of tunnels, provision of side drains
construction of portal walls at the face of tunnels etc.
It is proposed to select Contractors who are prepared to take the challenge and work along with us as empowered technical partner, who will be selected on the basis of information to be submitted along with supporting documents in prescribed format for pre-qualification of contractors for undertaking construction of tunnels mentioned above.
Following information for screening has to be submitted without fail :
a) Details
of tunnel works completed / in progress during 10 years.
b) Number
of projects where work is completed in time with clients certificates.
c) List
of machinery owned by the Contractors.
d) Details
of professional organization - man power with bio-data of professional staff.
e) Financial
status of the company including balance sheet for last 5 years. Turnover of the company
during the last 5 years (cumulative) should be Rs.50 Crores.
f) Details
of Arbitration cases, Court cases/ disputes for the works executed during last 5 years.
g) Experience
if any, for executing the works in Himalayas.
The
above details should be, submitted in the prescribed format on Excel Sheet, on a CD/Floppy
and one set of hard copy duly signed by the authorized signatory.
For
pre-qualifying the contractors for construction of tunnels more than 1 km in length
following weightage will be given against each item/strength of the contractors:
Sr.
No. |
Items |
Unit
for Assessment |
%
Weightage |
|||
1 i. |
Work
done experience during last 10 years- A)
Minimum two tunnels completed
each costing not less than Rs. 5.0 Crores. orB)
One single tunnel completed costing not less than Rs 10.0 crores. |
No. of works |
40 |
|||
ii. |
Works
in Progress: A) Minimum
2 tunnel works in progress costing not less than Rs.5.0 Crores each or Rs 10 crores
cumulative. or
B) Single
work costing not less than Rs. 10 Crore |
No.
of works |
15 |
|||
2 i.
|
Capability
to design the structure In house design organization consisting minimum of
competent 1 post-graduate Engineer (structures) and 2 graduate Engineers. |
No.
of Design engineers. |
05 |
|||
3 |
Availability
of machinery minimum number of plant and equipment to be owned by contractor is as
per Annexure
|
No.
of machinery. |
10 |
|||
4 |
Availability
of professional man power minimum number of key personnel required is as per
Annexure
|
No.
of Personnel |
10 |
|||
5 |
Financial
status. Turnover during last 5 years Rs.50 Crores (Cumulative) |
In
Crores |
10 |
|||
6 |
Number
of Arbitration/ disputes/ court cases in the last 5 years. |
Number
of cases : i.
Nil
Case ii.
Upto
2 cases iii.
More
than 2 cases |
0 -5 -10 |
|||
7 |
Experience
of any work in Himalayan region including
works in progress. |
No.
of works & their value in Crores |
10 |
|||
TOTAL |
|
|||||
NOTES:
A)The
Contractors fulfilling the criteria of 1 (i)
above with cumulative weightage of 60% only will be considered for pre-qualification.
B)
Processing charges of Rs.10,000/- will have to be deposited along with the
pre-qualification documents in the form of a Demand Draft drawn in the favour of Dy. FA
& CAO, KRCL, payable at Navi Mumbai.
C)
The applications for pre-qualification shall be submitted at the following address.
The
General Manager (Projects)
Konkan
Railway Corporation Ltd.
Raigad
Bhavan, 8th Floor
Plot
No. 4, Sector 11
CBD,
Belapur
Navi
Mumbai 400 614
D)
Joint Ventures (JV) are permitted. JV documents shall accompany the notarized copy of the
JV.
E)
In case design capability is outsourced, the letter of association from the agency
proposed for out sourcing shall be submitted. The design firm shall furnish details of
their capability in similar works.
F) The value of the work executed as a sub contractor will be considered for assessment provided the certificates are issued by the Clients.
G)
Base
Year and Escalation
H)
The
Agency is informed that only factually correct information is to be furnished. In the
event of detection of incorrect information, the Agency is liable to be summarily
disqualified or terminated or black-listed.
Note
: Please see the
Annexures.